NOIRMOUTIER PROJECT – E&I Works

Antwerp, Belgium

Project Description

Construction

The E&I construction part of the Noirmoutier Project (located 12 kilometres from the French coast – Loire region) had its greatest impact on the following phases and activities:
Equipment installation and testing; Testing; Cable installation and connection; Functional testing and Commissioning.

Total direct man-hours spent: 30. 000 hours

Services Provided:

Installation and connection of equipment
Installation of cables (power, control, signal, F&G, fibre optics)
Installation of Earthing Cables
Connection of BOP cables in the OVP Box Service Crane
Connection of BOP cables in the OVP Box Radar
Connection of cables in the OVP Box Nav Aids
Connection of cables in the OVP Box Network
Connection of cables in the OVP Box Low Voltage
Connection of cables in the ICCP Power & Control Unit
Cable connection at ICCP Transformer Unit
Cable connection at Low Voltage Junction Box
Cable connection at UPS Cabinet
Cable connection at Power & Network Unit
Cable connection at Splice Box
Cable connection at ICCP Junction Box
Functional test Power Supply (PWS- LVS)
Functional test EWP Low Voltage System & Single Socket
Functional test EWP Lighting
Functional test BOP Low Voltage System & Socket 1 and 2
Functional test SGP Low Voltage System & Socket 3 and 4
Functional test SGP Low Voltage System – Low Voltage Junction Box
Functional test SGP Switch Isolator – OVP Box Radar
Functional test SGP Low Voltage System – UPS Cabinet
Functional test SGP Lighting
Functional test CTP Lighting
Functional test ATP Lighting
Functional test ATP Low Voltage System & Socket 5 and 6
Test Low Voltage Distribution Board (LVC)