Geomethane

France

Project Description

Construction of a new compressor building and adjacent units (BDV/filtration/dépotage/utilities/aerials).

TCPI provided Instrumentation and Electrical services for a total of 18,900 hours of work.

Engineering

Detailed engineering of the areas of our intervention (Building C3 and platform C3).

Procurement

Supply of main and secondary cable trays – Quantity: 1,650 metres;

Supply of multi-cables and single instrumentation cables: Quantity: 25 kilometres;

Supply of power cables to supply lighting and electrical consumers Qty: 15 km;

Supply of instruments and mounting accessories Qty: 90 units;

Supply of junction boxes and control boxes Qty: 80 units;

Supply of electrical tracing Qty: 250 ml;

Supply of lighting and sockets Qty: 140 units;

Supply of Fire & Gas equipment in the units Qty: 140 units;

Construction

Installation of cable trays, cable passages and connections;

Installation of JB’s/control boxes;

Installation of instruments;

Installation of lighting/sockets;

Installation of Fire & Gas equipment;

Installation of electrical tracing, etc.

Client:

  • GEOMETHANE/STORENGY

Works Execution

  • 2024-2025