FPSO Kizomba_MV Cable Termination

Offshore (Block 15, FPSO Kizomba A), Angola

Services Provided

E&I activities in the following areas:

-Site Survey;
– Procurement Activities;
– Installation:
– Cable pulling supervision with roop access;
– Execution of MV Cable terminations;
– Final test
– Documentation and final report

Project Description

Supervision of cable installation from HV Panels PBE-68406 and PBE-68408 (13.8 kV) to Water Injection Pump PBE-68406 and PBE-68408, and execution of termination of HV cables due the out of service existing cable and the replacement of the Pump.

Procurement

Procurement of, 2 hole terminal lug 2/0, 2 hole terminal lug 16mm2, PVC cable ties, SS insulated cable ties, heat shrinkable cap 4 wires, Heat shrinkable cable termination kit, Roxtec RM120WOC, Roxtec RM60 Module, Cable Gland HAWKE 501/453/U .

Construction/Erection

Cable pulling supervision with rope access and execution of MV Cable terminations;

Client:

  • EXXON MOBILE

Works Execution

  • 2024-2025