Project Description
As a result of the dismantling of the Porto Refinery, including the Utilities Unit, the old power distribution system was modified.
Galp decided to use the existing A’/Y substation, built in 2010, to distribute electricity to the Logistics Park substations that will remain in operation, creating a new underground infrastructure, clearly identified and outside the dismantling area.
A new 400kVA emergency diesel generator was installed to power the LV (3F+N) emergency network for the PLM substations.
It was also necessary to relocate the loads to be maintained from substation D to the existing substation M, whose switchboards were replaced by existing ones.
Procurement
Cable ducts in trenches;
Medium voltage cables;
Low voltage cables;
Fibre optic cables.
Construction
Drilling, opening and closing of trenches;
Passage and connection of low voltage, medium voltage, control and fibre optic cables.
Between substations: Supply and installation of new metal structure for cable passage;
Replacement of low voltage switchboards;
Installation and connection of new generator including metal protective structure.