EPC – Ash Loading System
Portugal
Rendered Services
Dismantling of the ash inertisation line. Installation of the new transport system.
Project Description
The ash loading system at CTRSU arose from the need to convert the ash inertisation facility, which will no longer be active due to the ASMC inertised ash cell reaching capacity. This conversion will enable tanker trucks to be loaded directly in a safe and environmentally friendly manner.
Engineering
Detail engineering.
Procurement
Cable trays;
Electrical cables;
Electrical panels;
PLC;
Conveyors;
Valves;
Telescopic sleeves;
Metal structure modifications.
Client:
- VALORSUL
Work Execution:
- 2022-2023