EOLMED PROJECT

France

PROJECT DESCRIPTION

The Eolmed project comprises three 10 MW floating wind turbines that will produce around 110 million kWh/year in Gruissan and Port-La-Nouvelle (18 kilometres offshore) in France.

ENGINEERING

Detail drawing, datasheet, electrical and lighting panels, electrical diagram, etc.

CONSTRUCTION

Cable supports, pulling and connecting cables, installing instrumentation and lighting, supporting electrical cabinets, etc.

Quantities installed

– Lighting: 90 points
– Instrumentation: 75 points
– Cable: 7.5 kms
– Cable paths: 1 450 m

Client:

  • MP ARCHIMED SAS

End of Contract:

  • 2024-2025