EOLMED PROJECT
France
PROJECT DESCRIPTION
The Eolmed project comprises three 10 MW floating wind turbines that will produce around 110 million kWh/year in Gruissan and Port-La-Nouvelle (18 kilometres offshore) in France.
ENGINEERING
Detail drawing, datasheet, electrical and lighting panels, electrical diagram, etc.
CONSTRUCTION
Cable supports, pulling and connecting cables, installing instrumentation and lighting, supporting electrical cabinets, etc.
Quantities installed
– Lighting: 90 points
– Instrumentation: 75 points
– Cable: 7.5 kms
– Cable paths: 1 450 m
Client:
- MP ARCHIMED SAS
End of Contract:
- 2024-2025