Project Description
Contract for the Provision of Preventive Maintenance Services for Heating, Ventilation and Air Conditioning Equipment.
The Loulé Production Centre (CPL) is located in Cerro da Cabeça Alta, 7 km from the city of Loulé, and is one of three cement factories operated by CIMPOR in Portugal. Currently, the Loulé Production Centre has an installed capacity of 635,000 tonnes of clinker and 850,000 tonnes/year of cement.
Rendered Services
The contract covers the following:
- Technical Team;
- Specialised Maintenance Technicians;
- Workshop vehicle

