TURBINE GT 200 INTEGRATION PROJECT
Lobito, Angola
Rendered Services
TCPI provided Procurement, Construction of Electrical, Instrumentation and Testing at Turbine 89 MVA, in Lobito, Angola.
Project Description
Construction
Replacement of turbine; electrical and instrumentation supervision; Pipeline and fuel oil storage – supply, installation , commissioning and start up of all electrical, instrumentation, control system, leak detection system, data network and radio and optical fiber telecommunications switchboards. Reshuffle of 150kV substation – transformers, switchboards and emergency generator specifications, and detail project of substation 150/30KV renovation, including turbine 89 MVA 15KV connection to the existing 150KV power network. Installation supervision.
Client:
- ENE
End of Contract:
- 2017