Wastewater Treatment Plant (WWTP) Project

Alverca, Portugal

Services Rendered

TCPI INTERNACIONAL provided services of engineering, erection, pre-commissioning, commissioning and start-up services for the electricity and instrumentation works of the new WWTP (Wastewater Treatment Plant) at SIMTEJO, in Alverca, Portugal.

Project Description

Engineering

Basic and detail engineering that involved a total of approximately 1,000 man hours with 5 people in the peak period.

Procurement

Acquisition of bulk material and discriminated equipment, such as electrical panels and transformer panels, UPS’s, automatism, cables, cable tray, junction boxes.

Construction

Construction and installation activities for the total electrical and instrumentation part of the works involving approximately 15,000 man hours with 25 people in the peak period.

Installed Quantities

Cable trays: 2,100m
Conductors: 2,000m
Power Cables: 30,000m
Instrumentation Cables: 45,000m
Junction Box: 32 units
Local Control Box: 174 units
EV Local Control Box: 18 units
UPS: 2 units
CCTV: 27 units
Earthing system (cable installation): 1.070m
Instruments: 130 units
LV Panels and Local Panels: 15 units
High voltage panels: 4 units
Lighting protection: 1 unit
Transformer: 1 unit
VFD: 30 units
Lighting: 90 units