Project Description
Fuel storage park (Diesel, Gasoline and Bio fuel), consisting of:
5 fuel tanks (20m3x3; 14m3x2) = 88m3 each;
1 water tank (11m3);
Fire network;
5 truck filling islands;
9 tank filling pumps.
This investment in Mozambique is the largest ever made in Africa, in the downstream domain.
Rendered Services
Construction and commissioning of electricity, instrumentation, access control and CCTV.
Work developed in 2020 (duration 8 months), in a total of 35000 man-hours and 75 people at work peak.